Basic steps in investing at solar panel systems


1. Assessment or identification of the property at which solar systems will be installed, to achieve maximum efficiency at minimum cost.
2. Determination of the optimal solar solution based on the available land and capital from the investor and location of desired specifications.
3. Collection and evaluation of supplier bids.
4. Preparation and submission of documentation for obtaining production license or license exemption (for installations up to 150 KW).
5. Applying at DEI along with the relevant technical preliminary study, for the connection on the network.
6. Write premeditated environmental conditions and feasibility studies for financing of investment by the investment law, if a relevant program for investments in energy exits.
7. Signing a contract with the supplier and start implementing the project.
8. Signing a connection contract with DEI.
9. Preparation and submission of environmental studies for installations above 20 KW.
10. Issue installation and operation license for facilities above 150 KW.
11. Signing a contract to sell electricity to the DESMIE (Greek System Operator of Electric Power Transportation).
12. Submit reports on progress / completion for the development law and grant disbursement, if there is a program of energy investments and the company has incorporated in it.
13. Completion of project, connection to the electricity network and start the unit.